For flexi schedule, Admin has the option to enable the work code for job costing. If this option is enabled, users assigned to this schedule will have to insert the work code every time they perform clocking.

As job-costing objective is to track on the cost of each job performed by the employee, it is only right to allow Admin to add the rate per hour for the employee in this feature.

The rate/hour will be added in the Remark/Work Code section. The steps are as below:

  1. Add work code.
  2. Click “+ Add Users” to assign users into the work code.
  3. Select Users and add their rate in Rate/Hour column.